Google search engine

The Ashanti Sub-Transmission Line Maintenance Team of ECG has restored power supply to the Bekwai and Kuntanase enclave after repairing faults on the 33kV Bekwai 1 and 2 lines early Sunday morning, October 18, 2026.

‎The faults, which occurred the previous night, were located during a line patrol and fixed through the replacement of a shattered lightning arrestor and the repair of a broken high-voltage jumper at the first pylon on the Bekwai 1 line.
‎
‎The repairs restored both interconnectors, enabling power supply to resume to eight affected feeders serving Kwamang, Unicem, Fukai, Abodom, Kokofu, Ghana Water, Boamang and Sawaba.
‎
‎The swift intervention underscores ECG’s commitment to service excellence, prompt fault resolution and reliable electricity supply to homes, businesses and essential services.

Equipment failure, cable faults caused recent power outages in Ashanti Region – ECG explains

By Benjamin Aidoo